Antique Long lead 14 k Gold Watch Chain with Trombone Links






Antique Long lead 14 k Gold Watch Chain with Trombone Links
$3,600.00
        This exceptionally long 14k watch chain with trombone links and original dog clip is 60" wonderful for most any sized pendant.
Quantity:
  
 
            